The FA22080AC Square D 2-Pole 80A 240V AC Breaker is designed for reliable circuit protection in residential and commercial applications. With a durable build and efficient performance, this breaker ensures safety and longevity. Ideal for a variety of electrical systems, it is perfect for both new installations and replacements.
| Brand | Square D |
|---|---|
| Type | Standard (Thermal-Magnetic) |
| Amperage | 80 A |
| Poles | 2-Pole |
| Voltage | 240V |
| Interrupting Rating | 10 kA |
| Mounting | Plug-In |
| Frame / Series | FA |
| Catalogue # | SQDFA22080AC |
The Square D FA22080AC is an FA-frame, 2-pole, 80A, 240V plug-in breaker with a 10kA interrupting rating. As an FA-frame molded-case breaker, it is designed to mount in compatible Square D panelboards and switchboards that accept FA-frame plug-in devices — it is not a residential QO or Homeline breaker and will not fit standard loadcentres.
FA-frame breakers are typically used in commercial and light industrial panelboards. Because frame fitment depends on your specific enclosure or panelboard model, please send us your panelboard model number and we'll confirm compatibility before you order.
No — the FA22080AC is an FA-frame molded-case breaker intended for compatible Square D commercial panelboards and switchboards, not residential QO or Homeline loadcentres. If you're unsure whether it fits your enclosure, send us your panelboard model and we'll confirm the right fit.
Yes. Sourcing obsolete and hard-to-find Square D breakers like the FA22080AC is exactly what we specialize in. Stock levels on discontinued breakers can change quickly, so contact one of our Calgary, Edmonton, or Vancouver counters or request a quote online to check current availability.
Always verify that the replacement breaker's interrupting rating meets or exceeds the available fault current at your panel. The FA22080AC is rated at 10kA at 240V AC. If your system's available short-circuit current exceeds 10kA, you'll need a higher-rated device. A qualified electrician or engineer can confirm this from your coordination study or panel schedule.
